•  

    Customer Supports

    (+95) 9 457747994 / 9 457747993

ACTIVITES

 

 

INSPECTION  AND TESTING


Petronas Main office yearly inspection and testing

 

INSULATION TEST


Low Insulation test of 3 phase Motor and control panel

 

INSPECTION  AND TESTING


Inspected Error code and tested of sequencial motor driven control panel.

 

EARTH   RESISTANCE  TEST

Earth resistance tested for telecom tower L.A and
Equipment earthing

 

RDU TOWER

BA 0689
RDU Tower Installation

 

RDU TOWER

MDT 20371
RDU Tower Installation

 

RDU TOWER

MG 0265
RDU Tower Installation

 

RDU TOWER

AYT 10126
RDU Tower Installation

More Articles ...

Page 3 of 4
  • Electrical Wiring Installation

    Read More
  • Electrical Control and Design

    Read More
  • Security Alarm System installation

    Read More
  • Electrical Engineering Design and Estimation

    Read More
  • Electrical Inspection, Testing and Commissioning

    Read More
  • 1
  • 2